Measurements & Calculations

How Many Fence Posts, Rails and Pickets Do I Need?

Work out fence posts, sections, rails, pickets and post-hole concrete from your fence length and spacing — with a pickets-per-foot chart and worked example.

A narrow gravel path laid along a wooden fence beside a lawn and brick gate pillars
A wooden fence beside a lawn. Every fence starts with the same count: sections, then posts, rails and pickets. Photo: ghewgill via Flickr · CC BY 2.0 · cropped and resized
On this page (7 sections)

A fence materials list comes down to four counts — sections, posts, rails and pickets — plus concrete for the posts. Get the post count right first: everything else hangs off it.

Check property lines, permits and any local height rules before you order. Post depth and spacing depend on the fence height, wind and soil; follow your fence supplier or local code.

Sections and posts

Sections = Fence length ÷ Post spacing, rounded up
Posts = Sections + 1 for each separate run

The “+1” is the end post. A continuous fence with corners still needs only one extra post, because each corner post is shared by two sections. A fence broken by a driveway or a gap is two runs, so it needs two end posts.

Rails

Rails = sections × rails per section. Two rails are common on short fences and three on taller ones, but use what your design calls for.

Pickets

Pickets = Fence length ÷ (Picket width + Gap)
Picket and gapPer footPer 100 ft
3.5 in + 0.5 in gap3300
3.5 in + 2 in gap2.18218
5.5 in + 0 in gap2.18218
5.5 in + 0.25 in gap2.09209
5.5 in + 2 in gap1.6160

Exact arithmetic for the stated widths. Use the actual (not nominal) picket width — a “1 × 6” board is usually narrower than 6 in.

Worked example

120 ft of fence in one run, posts every 8 ft, 2 rails, 5.5 in pickets with ¼ in gaps, 5% spare.

  1. Sections = 120 ÷ 8 = 15
  2. Posts = 15 + 1 = 16
  3. Rails = 15 × 2 = 30
  4. Pickets = 1,440 ÷ 5.75 × 1.05 → 263
  5. Concrete for 16 holes 10 in across and 30 in deep, +10%: 24 cu ft (0.89 cu yd) — less the volume of the posts.

Fasteners and hardware

Each picket is usually fixed to every rail with two fasteners, so fasteners = pickets × rails per section × 2. For the example, 263 pickets × 2 rails × 2 = 1052 fasteners, plus rail brackets or screws where rails meet posts (rails × 2 ends = 60). Check your fence design and fastener packs, which are often sold by weight or count — buy a box more than you need rather than run out.

Complete checklist

  • Posts (and any heavier gate posts)
  • Rails and pickets, or pre-built panels
  • Concrete or gravel for setting posts
  • Fasteners, rail brackets, post caps
  • Gate hinges, latch and stop
  • Stain or sealant — coverage is on the can, per square foot of fence face (length × height × 2 sides)

Gates and slopes

  • Gates: add gate posts (often heavier), hinges and a latch for each gate, and subtract the gate width from the picket count.
  • Slopes: measure the length along the ground. On a slope, sections are either stepped or racked to follow the ground; use the Slope Calculator to check the grade.

The Fence Calculator works this out for any length and spacing, and the Concrete Calculator handles the post holes.

Sources

  1. NIST Special Publication 811 — Guide for the Use of the International System of Units (SI) — Exact definitions of the inch, foot, yard, acre, pound, US gallon and the cubic yard used in every calculation in this guide.

Sources were checked when this guide was published. Where published guidance differs, this guide says so; for structural work, follow your local specification.

Worked examples are generated by the same tested calculation engine as our calculators. See our editorial policy and methodology.